FACT SHEET 1: Four KM ROAD PAVING AND FENCING
Construction of a 4-km road and installation of cyclone fencing along the newly constructed entrance road. All earthmoving, compaction and asphalt road build-up.
Client: Parsons, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
Work was performed according to the standards set forth in the Scope of Work. Positive feedback was received from the client on this project.
Timeliness of Performance
ALMCO completed this contract as scheduled following eight weeks of performance. We mobilized the project within 24 hours to immediately respond to our client’s needs.
Economy of Problem Resolution
No economic problems occurred during the course of the project.
Cooperative Manner
To ensure that ALMCO responded to the client’s needs and was cooperative at all levels; a proper communication system was set in place. Proper communication was ensured through the application of a management information system that emphasizes reporting, communication channels and feedback. No complaints of non-cooperation were reported.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO and is the basis of our reputation and good conduct. Parsons Corporation has been a client since our inception and has been satisfied with our performance. This is proven in numerous recommendation letters and recurring projects.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO successfully completed this project with zero incidents.
FACT SHEET 2: Two KM ROAD PAVING AND FENCING
Construction of a 2-km portal road and installation of fencing along the newly constructed entrance road. All earthmoving, compaction and asphalt road build-up.
Client: Parsons, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
Work was performed according to the standards set forth in the Scope of Work. Positive feedback was received from the client on this project. No deviations or corrective actions.
Timeliness of Performance
ALMCO completed this contract as scheduled following 5 weeks of performance. We mobilized the project within 48 hours to immediately respond to our client’s needs and finished 1 week ahead of schedule.
Economy of Problem Resolution
No economic problems occurred during the course of the project.
Cooperative Manner
To ensure that ALMCO responded to the client’s needs and was cooperative at all levels; a proper communication system was set in place. Proper communication was ensured through the application of a management information system that emphasizes reporting, communication channels and feedback.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO and is the basis of our reputation and good conduct. Parsons Corporation has been a client since our inception and has been satisfied with our performance. This is proven in numerous recommendation letters and recurring projects.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO successfully completed this project with zero accidents or incidents.
FACT SHEET 3: RENOVATION WORK AT BATTALION 5, PHASE III
Client: Parsons, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
This project has been highly praised by the client and it was deemed of the highest quality. Renovation work was executed according to the best standards and it was considered the project of the month on the Parsons website. ALMCO also received a schedule and within letter of commendation, included on the following page.
Timeliness of Performance
ALMCO mobilized the project within 72 hours and completed the project five days ahead of the scheduled completion date.
Economy of Problem Resolution
Given the nature and location of the construction site, resourcefulness and efficiency were considered prime elements for successful project completion. The main strength in all Taji projects comes from our logistical capabilities throughout Iraq and the resources available from our Taji office, which allows us to take instant action and provide immediate feedback on site.
Cooperative Manner
To ensure that ALMCO responded to the client’s needs and was cooperative at all levels; a proper communication system was set in place. Proper communication was ensured through the application of a management information system that emphasizes reporting, communication channels and feedback. No complaints of non-cooperation were reported.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO as it is the basis of our reputation and good conduct. Parsons Corporation has been our client since our inception and has been extremely satisfied with our performance. This is proven by numerous commendation letters and recurring projects.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO is proud to announce there were zero accidents or incidents on this project.
FACT SHEET 4: DEMOLITION OF DEPOT AREA ZONE (5+6)
Client: Amec, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
The quality of work performed was exceptional. The final cleared field was virtually pristine and showed no evidence of the structure formerly located there.
Timeliness of Performance
Work was completed within budget and on schedule.
Economy of Problem Resolution
Because of the complexity of this structure and the amount of heavy equipment required for the demolition, the task was subdivided into five segments: Initial clearing and debris removal, heavy disassembly of internal works, a second clearing of all removed steelwork, final demolition of the masonry works, and finally removal of masonry and ground leveling. Labor crews from other ALMCO projects in the area were phased as needed between high labor intensive phases and the high equipment intensive phases to prevent having to mobilize multiple work crews. Integrity was maintained, leading to better productivity and safety.
Cooperative Manner
ALMCO executive management was on-site at all times during the project to provide a constant flow of communications between the customer and the work crews. Problems were resolved at the lowest possible level in a timely manner.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO as it is the basis of our reputation and good conduct. AMEC has been our client since our inception and has been highly satisfied with our performance. This is proven by numerous recommendation letters and recurring projects.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO attained zero accidents or incidents on this project.

FACT SHEET 5: CONSTRUCTION OF THE LARGEST AIRCRAFT HANGAR IN IRAQ (3,500 SQUARE METERS) AT TAJI.
Client: Amec, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
The as-build quality of work performed was equal to or greater than the specified requirements. No rework or repair was required prior to handover.
Timeliness of Performance
The project completed ahead of schedule and under budget.
Economy of Problem Resolution
The need for this hangar was critical and rather than make our customer wait through the entire construction project, ALMCO suggested the approach of erecting a similar sized temporary hangar on the site, constructed of heat resistant tenting and non-fixed solid walls. This provided a stop gap measure that enhanced the customer’s quality of service to the US military.
Cooperative Manner
ALMCO gave high priority to not only the timely completion of this project without sacrificing safety or quality. Sr. Management was continuously in the area and decisions could be made locally to ensure the highest level of customer satisfaction and the minimal amount of down time waiting for decisions.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO as it is the basis of our reputation and good conduct. AMEC has been our client since our inception and has been satisfied with our performance. This is proven by numerous recommendation letters and recurring projects.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO attained zero accidents or incidents on this project.

FACT SHEET 6: RENOVATION OF EXISTING BUILDINGS SPECIAL POLICE REGIMENT OPERATIONS
Client: Amec, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
The quality of work performed exceeded expectations, especially in the limited timeframe for this project.
Timeliness of Performance
Work was executed in a record time of six weeks and completed as scheduled.
Economy of Problem Resolution
Due to the time constraint on this project, the main emphasis was on efficient time and project management. It was essential to identify restrictions in production time and minimize the margin of error through direct supervision of subcontractors and providing in-house life support for the workers
Cooperative Manner
To ensure ALMCO responded to the client’s needs and was cooperative at all levels; a proper communication system was set in place. Proper communication was ensured through the application of a management information system that emphasized reporting, communication channels and feedback. No complaints of non-cooperation were reported.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO as it is the basis of our reputation and good conduct. AMEC has been our client since our inception and has been satisfied with our performance. This is proven by numerous recommendation letters and recurring projects.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO attained zero accidents or incidents on this project.
FACT SHEET 7: TENT CITY TURNKEY CONSTRUCTION CAMP
Client: Amec, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
All work specifications were in compliance with the Statement of Work and our efforts were commended by the client. Please see letter of commendation on the following page.
Timeliness of Performance
This critical project was completed in a record time of six weeks. ALMCO was awarded this project on November 30, 2004 and mobilized within 24 hours.
Economy of Problem Resolution
Due to the nature of this project, it was prudent to ensure our logistical and commercial capabilities. Our staff logistical and commercial teams worked two daily shifts and ensured operations would not be interrupted by material shortages.
Cooperative Manner
To ensure that ALMCO responded to the client’s needs and was cooperative at all levels; a proper communication system was set in place. Proper communication was ensured through the application of a management information system that emphasizes reporting, communication channels and feedback. No complaints of non-cooperation were reported.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO and is the basis of our reputation and good conduct. AMEC has been a client since our inception and has been satisfied with our performance. This is proven by numerous recommendation letters and recurring projects. A letter of appreciation is included on the following page to illustrate our commitment to customer satisfaction.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO has zero accidents or incidents on this time-critical project.
FACT SHEET 8: RENOVATION OF WASTE WATER TREATMENT PLANT
Client: Parsons, Tadji, Iraq
Location: Tadji Military Base
Quality of Performance
Feedback from our client concerning this project has been positive. ALMCO received a letter of commendation from our client which is included on the following page.
Timeliness of Performance
EastALMCO mobilized within 24 hours and completed this project within the 10 days ahead of schedule.
Economy of Problem Resolution
As demonstrated in the recommendation letters, this project was completed successfully due to the persistence and dedication of ALMCO’s engineers.
Cooperative Manner
To ensure ALMCO responded to the client’s needs and was cooperative at all levels, a proper communication system was set in place. Proper communication was ensured through the application of a management information system that emphasized reporting, communication channels and feedback. No complaints of non-cooperation were reported.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO and is the basis of our reputation and good conduct. Parsons Corporation has been a client since our inception and has been satisfied with our performance. This is proven by numerous recommendation letters and recurring projects.
Safety
The Safety Manager and his team were responsible for enforcing the safety and health standards on the work site. ALMCO successfully completed this project with zero accidents or incidents.
FACT SHEET 9: SADR CITY WATER TREATMENT PLANT
Client: Parsons - USAID, International Zone, Iraq
Location: Sadr City
Quality of Performance
To date, our work has been highly praised by our client in daily QA reports by USAID.
Timeliness of Performance
We have performed more than 68% of the project and we expect to finish the project two months ahead of the initial completion constraints date of June 2006. Of particular note, ALMCO was able to construct 3000 12-meter reinforced concrete pilings in 45 days, a schedule that was thought impossible at the outset of the project.
Economy of Problem Resolution
Due to nature of the site location, it was essential that ALMCO establish good contacts with the governorate of Al Sadr city to ensure the smooth flow of work and material. The project has proceeded without any problems to date.
Cooperative Manner
To ensure ALMCO is responding to the client’s needs and is being cooperative at all levels, a proper communication system has been set in place. Proper communication is ensured through the application of a management information system that emphasizes reporting, communication channels and feedback. No complaints of non-cooperation have been reported.
Customer Satisfaction
Customer satisfaction is the main goal of ALMCO and is the basis of our reputation and good conduct. Parsons Corporation has been a client since our inception and has been satisfied with our performance. This is proven by numerous recommendation letters and recurring projects.
Safety
The Safety Manager and his team are responsible for enforcing the safety and health standards on the work site. ALMCO has performed this project with zero accidents or incidents to date.

|
| Relevancy |
 |
 | Military facility |
 |
 | 190 mm Asphalt on a 150 mm sub-base |
 |
 | Construction project |
 |
 | Completed ahead of schedule and within budget constraints |
 |
 |
 |
 |
 |
 |
 |
| ALMCO OWNED 120 TON per Hour Asphalt Plant |
 |
| Relevancy |
 |
 | Military facility |
 |
 | 190 mm Asphalt on a 150 mm sub-base |
 |
 | Construction project |
 |
 | Completed ahead of schedule and within budget constraints |
 |
 |
 |
 |
 |
| Relevancy |
 |
 | Military facility |
 |
 | 190 mm Asphalt on a 150 mm sub-base |
 |
 | Construction project |
 |
 | Completed ahead of schedule and within budget constraints |
 |
 |
 |
 |
 |
 |
 |
 |
| These before and after exterior photos demonstrate our workmanship under the renovation contract |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
| Relevancy |
 |
 | Supporting military or public facility |
 |
 | Design/Build project |
 |
 | Located in the Middle East |
 |
 | Completed within the past six years |
 |
 | Completed 10 days ahead of schedule and $110,000 under the original budget |
 |
 |
 |
 |
 |
| Relevancy |
 |
 | Public facility |
 |
 | Design/Build project |
 |
 | Currently three months ahead of schedule and within budget constraints |
|